After installing the EST system, the water treatment machine in the cooling tower system has been used for 6 months. The company has turned on the EST machine to clean and check the operation of the equipment. All equipment is in normal working condition. And turn on the EST system to check the operation. Everything is normal. After completing the check, we collected the limestone or scale that we had cleaned the EST machine. It can be seen that there is a lot of scale. It is calculated to be no less than 50 kg. Our customers are very impressed with the efficiency of the EST system. It confirms that it can eliminate scale in the cooling tower system and the chiller system. The long-term result is that it can significantly reduce maintenance costs. Reduce chemical use by 100%, reduce bowing by more than 50%, and have a definite payback period.