Elgressy chemical-free water treatment banner

Some of Our Elgressy Installations

New project for POSE Medical Chachoengsao

Installation was completed December 14

New project for UNILAB - Manila - Philippines completed December 2021

TYK - Amata Eastern Seaboard EST Installed and running since December 16 - 2021

ALL UVPC PIPES PAINTED

Training and commissioning Dec 16-2021

TYK cooling towers with Elgressy EST and painted UPVC pipes, Amata Eastern Seaboard, Thailand

SCG -KRAFT – KABINBURI – Thailand – Installation completed and commissioned in September 2020 and performing very well. Drain B4 EST with chemicals ~ 45 m3/day, with EST green & clean ~ 10 m3/day.

Beta Weave – Bangkok 2019

Nana Square - Sukhumvit - Bangkok - EWT installed 2018

Where you loose your money?

Well, Scale – corrosion -algae/bacteria/legionella = bad news! ALL this bad news will not happen when our EST is installed. See below images without EST, if you have issues like this then call us right away, as we will solve your problems right away and SAVE you loads of head aches and money!

UNILEVER – Manila – Philippines 2018 Phase 1

From: Jimenez, Michael - UNILEVER Sent: Friday, December 3, 2021 11:15 AM To: Aeriallift Asia ALA; Abenido, Jun - UNILEVER; Manee Kaewloy Cc: melchor.dado@gljm-dssc.com; Lolita Leviste Subject: RE: [External] - Hi Dick, Just recently, we had our EST serviced by GLJM, led by Mel Dado. Lots of scales recovered from the EST and no scales found on the condenser coils. I will collect some pictures and send.-

Service cleaning at UNILEVER 2021

Isuzu – Bangkok – 2018

Coca Cola – Philippines 2017 Calcium everywhere B4 EST treatment.

EAGLE CEMENT – Philippines 2017 EST + EEC for calcium and Silica removal.

Olympia Towers – Bangkok 2017

HOLCIM – Philippines 2016

Mitusbishi – Laem Chabang –Thailand phase 1 and phase 2 installed 2015 and 2016

Mitsubishi Motors logo
Elgressy EST installation at Mitsubishi Motors, Laem Chabang, Thailand

Bridgestone – Rangsit – Pathum Thani – 2016

AB FOOD – Samut Prakarn – Thailand – 2015 phase and phase 2

United Nations – Bangkok installed 2013 – see image 1 piping  and image 2 after 8 years, AS NEW!  SCADA installed.

Crystal clear CT water and full filler flow

Crystal-clear cooling tower water with Elgressy EST at United Nations Bangkok
Crystal-clear cooling tower water with Elgressy EST at United Nations Bangkok
Full water flow over the cooling tower fill with Elgressy EST

EL CHL installed

Elgressy EL-CHL on-site chlorine generation system at United Nations Bangkok
Elgressy EL-CHL on-site chlorine generation system at United Nations Bangkok

Ice Factory – Samut Prakarn – Bangkok installed 2012

Elgressy EST installation at an ice factory in Samut Prakarn, Thailand
Elgressy EST installation at an ice factory in Samut Prakarn, Thailand

Denso - Thailand

Denso logo, Elgressy client
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025

New EST phase 3 project at Mitsubishi

New EST project at Samyan Mitr

New project at Aman Nai Lert

New project at Silom Park

Denso logo, Elgressy client

New DENSO -Thailand project commissioned.

Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST installation at Denso, Thailand, 2025
Elgressy EST phase 3 installation at Mitsubishi Motors Thailand, 2025
Elgressy EST phase 3 installation at Mitsubishi Motors Thailand, 2025
Elgressy EST phase 3 installation at Mitsubishi Motors Thailand, 2025
Elgressy EST phase 3 installation at Mitsubishi Motors Thailand, 2025

4 x EST-N at Samyan Mitrtown - Bangkok

Four Elgressy EST-N units at Samyan Mitrtown, Bangkok
Samyan Mitrtown logo, Elgressy client
Four Elgressy EST-N units at Samyan Mitrtown, Bangkok
EST drain and sieve at Samyan Mitrtown, Bangkok
Elgressy EST installation at Samyan Mitrtown, Bangkok
Cooling tower make-up water meter at Samyan Mitrtown, Bangkok
Cooling tower return line at Samyan Mitrtown, Bangkok
Three EST circulation pumps of 72 m3/h at Samyan Mitrtown, Bangkok
Main distribution board at Samyan Mitrtown, Bangkok

New installation at Aman Nai Lert Hotel Bangkok

Aman Nai Lert Bangkok logo, Elgressy client
Aman Nai Lert Hotel, Bangkok
Elgressy EST installation at Aman Nai Lert Hotel, Bangkok
Elgressy EST installation at Aman Nai Lert Hotel, Bangkok

New installation at Silom Park Bangkok

Park Silom logo
Elgressy EST installation at Silom Park, Bangkok: cooling towers and EST shelter
Elgressy EST installation at Silom Park, Bangkok: cooling towers and EST shelter
Elgressy EST installation at Silom Park, Bangkok: cooling towers and EST shelter
Elgressy EST installation at Silom Park, Bangkok: cooling towers and EST shelter

Watertreatmentasia is a subsidiary of Aerial Lift Asia Co.,Ltd.

Aerial Lift Asia is official and exclusive distributor of ELGRESSY for S.E. Asia.

Opening Hours:

Mon – Friday: 8AM – 5PM.
Saturday: 8AM – 12PM.
Sunday: Closed

© 2026 Water Treatment Asia, a subsidiary of Aerial Lift Asia Co., Ltd.
All Rights Reserved
| Disclaimer

Our Visitor :

004952
Hi! Can I show you around?